01Case study
- Year
- 2025
- Site
- Hood River, Oregon
- Client
- The Okonkwo family
A ridge site with no power, no water and a nine per cent slope
A 40 ft off-grid unit set on screw piles at 2,400 ft, running entirely on a 6.4 kW array and a buried cistern, delivered against a fixed price on a site the utility company declined to quote.
01The site
The nearest three-phase pole was 1,900 ft downhill and the connection quote came back at more than the cost of the house. The plot fell nine per cent across its width, the access track would not take a concrete truck, and the county required a permanent-dwelling application rather than a recreational structure, which meant stamped structural calculations for a site with a design wind speed of 110 mph.
02What we did
We took concrete out of the equation entirely. The unit sits on twelve helical screw piles installed in a single day by a two-person crew with a mini-excavator, which levelled the nine per cent fall without a retaining structure. The solar frame was welded to the container corner castings in the yard and wind-rated as part of the structural submission, so it went in as one package rather than a later amendment. The battery bank sits in a conditioned service bay off the plant room, sized for four consecutive days without generation. Rainwater feeds a 1,500 gallon buried cistern and a four-stage filter to potable standard.
03How it turned out
The permit was approved on the second submission after a single request for further information. The unit left the yard fourteen weeks after the contract was signed and was watertight and connected on the second day of the install. Through the first full winter the battery bank did not fall below forty per cent state of charge, including a nine-day period of heavy overcast in January. The family have not paid a utility bill since they moved in.
- dollars of grid connection cost
- 0
- weeks from contract to delivery
- 14
- days on site from crane to keys
- 2